BEST PRACTICE
Engel Austria GmbH
ENGEL invests in sustainable infrastructure optimization to improve working conditions:
Schwertberg, Upper Austria:
A production hall built by ENGEL Austria GmbH in the 1970s had the classic problems of many older production halls — cold in winter, hot in summer, without an adequate supply of fresh air.
Such indoor climate conditions pose a challenge for humans and machines. Motivation and health suffer, manufacturing conditions are made unnecessarily difficult.
We at INFRANORM® were commissioned to analyse the situation and implement a suitable system to sustainably improve the situation.

Heli-transport of the elements to the centrally located hall
Neue Perspektiven wagen? Best Practices jetzt downloaden!
Nicht für alle. Nur für Neugierige mit Weitblick.
Fordern Sie jetzt Ihr PDF an – einfach Formular ausfüllen.